SYSTEM FRICTION INSTITUTE
OFFICIAL PUBLICATION
SFI-WB-001
FIELD WORKBOOK
SYSTEM FRICTION INSTITUTE

Frictionnaut Field Workbook

Operational sheets for SFI field operators.
DOCUMENT
SFI-WB-001
VERSION
1.0
STATUS
FIELD WORKBOOK
SERIES
SFI Technical Library
Operator Workbook

Before the Field

Observe the operator before observing the case.
SYSTEM FRICTION INSTITUTE
OPERATOR WORKBOOK
SFI-WB-001
OBSERVED
OPERATOR WORKBOOK

Operator Self-Check

FieldRecord
What do I know?
What am I assuming?
What evidence is missing?
What must not be inferred?

Do not intervene until the hypothesis has been registered.

SYSTEM FRICTION INSTITUTE
OPERATOR WORKBOOK
SFI-WB-001
OBSERVED
OPERATOR WORKBOOK

Session Capture

FieldRecord
Literal phrases
Silences
Contradictions
Bodily shifts

Do not intervene until the hypothesis has been registered.

SYSTEM FRICTION INSTITUTE
OPERATOR WORKBOOK
SFI-WB-001
OBSERVED
OPERATOR WORKBOOK

Hypothesis Sheet

FieldRecord
Case ID
Phenotype estimated
SSP expected
Explicit prediction
Probability

Do not intervene until the hypothesis has been registered.

SYSTEM FRICTION INSTITUTE
OPERATOR WORKBOOK
SFI-WB-001
OBSERVED
OPERATOR WORKBOOK

Perturbation Sheet

FieldRecord
Type
Why this type
Risk
Do not do
Success criterion

Do not intervene until the hypothesis has been registered.

SYSTEM FRICTION INSTITUTE
OPERATOR WORKBOOK
SFI-WB-001
OBSERVED
OPERATOR WORKBOOK

72h Return

FieldRecord
Movement observed
Evidence
EP_state update
Prediction status

Do not intervene until the hypothesis has been registered.

SYSTEM FRICTION INSTITUTE
OPERATOR WORKBOOK
SFI-WB-001
OBSERVED
OPERATOR WORKBOOK

7d Return

FieldRecord
Trajectory sustained
CP days
New evidence
Hypothesis status

Do not intervene until the hypothesis has been registered.

SYSTEM FRICTION INSTITUTE
OPERATOR WORKBOOK
SFI-WB-001
OBSERVED
OPERATOR WORKBOOK

30d Return

FieldRecord
Consolidation
Regression
Instrument mutation
Atlas update

Do not intervene until the hypothesis has been registered.

SYSTEM FRICTION INSTITUTE
OPERATOR WORKBOOK
SFI-WB-001
OBSERVED
OPERATOR WORKBOOK

90d Return

FieldRecord
Structural integration
Prediction accuracy
Protocol update
Archive decision

Do not intervene until the hypothesis has been registered.

SYSTEM FRICTION INSTITUTE
FIELD NOTES
SFI-WB-001
OBSERVED
FIELD NOTES

Free Observation Page 1

SYSTEM FRICTION INSTITUTE
FIELD NOTES
SFI-WB-001
OBSERVED
FIELD NOTES

Free Observation Page 2

SYSTEM FRICTION INSTITUTE
FIELD NOTES
SFI-WB-001
OBSERVED
FIELD NOTES

Free Observation Page 3

SYSTEM FRICTION INSTITUTE
FIELD NOTES
SFI-WB-001
OBSERVED
FIELD NOTES

Free Observation Page 4

SYSTEM FRICTION INSTITUTE
FIELD NOTES
SFI-WB-001
OBSERVED
FIELD NOTES

Free Observation Page 5

SYSTEM FRICTION INSTITUTE
FIELD NOTES
SFI-WB-001
OBSERVED
FIELD NOTES

Free Observation Page 6

SYSTEM FRICTION INSTITUTE
BACK COVER
SFI-WB-001
OBSERVED
BACK COVER

Frictionnaut

SYSTEM FRICTION INSTITUTE

Record.
Predict.
Return.